(91) It all starts here! Our pre-cut, pre-drilled package is built in our plant before it even gets to you!
The trusses are manufactured and built in our plant and ready to load.
Completing layout for the sonatubes or for the leg placement on a concrete pad is critical.
Preparing for Sonatubes.
The Sonatubes were poured!
The layout is taking shape!
Trucks are loaded and ready for an early morning delivery.
A material handler can do the job. Setting the legs prior to assembly.
(91) Families for Forty Fort Park, Forty Fort, PA 24' x 60'
A material handler can do most of the lifting!
(92) Legs come preassembled for a quick and easy install
(98) New T-Leg design makes for a 13.5" beam
(99) This pavilion isn't going anywhere with a T-Leg secured to the concrete
Trusses arrive.
Unloading the trusses from the trailer.
Truss #1
Setting Truss #1
Moving truss #2 into place
Booming truss #3
Ready for Truss #4
(93) Trusses are preassembled and boomed into place!
The sun is still up and we are moving right along!
The 'WOW' factor.
Setting the main purlin to make sure the structure is level and plumb
The main purlin is on and the sun is STILL up. This far Day #1
Pre-cut, pre-drilled purlins make this part of the job a breeze.
Day #2 All the purlins are on
And we are ready to start the sheeting.
(100) Solid blocking between the purlins lends for added strength
(102) Solid blocking throughout the pavilion
(101) Solid Blocking and notice the additional saddle for lighting!
Final front view
(97) Day 3 and ready to host community events!
We are proud to have been a part of this community project!
The pavilion components arrive!
Pre-assembled legs are taken off the truck and moved to the concrete pad with a material handler.
Steel plates and lag bolts secure the legs together. Note: a material handler with a jib is all this pavilion needed!
Securing the legs
The pre-assembled trusses add to the ease of the installation.
With our pre-cut, pre-drilled design, all it takes is an impact gun and the lag bolts!
An adult erector set!
Add the top purlin to ensure the frame is straightened.
Next step...purlins are ready.
Begin loading the purlins onto the trusses.
Purlins are pre-cut and pre-drilled for ease in securing to the trusses.
Roof sheeting is pre-cut which allows you to move right along.
A nail gun is all you need and the roof sheeting is complete!
It's coming together!
Solid steel plates add a dramatic look!
The view of the timbers from the inside!
Metal roofing....36"wide sheets pre-cut to length. Available in 17 colors.
Our pre-cut, pre-drilled design is the reason this pavilion was completed in 2 days! Why spend weeks when you could be enjoying your outdoor space in days!